Your $2,500 reservation deposit secures your production slot and stamped Missouri engineering plans, and is credited in full toward the 40% first draw on your contract. Remaining draws are billed by ACH invoice.
Post frame buyers: Step 1 is the Design and Permitting Package, $2,500 flat and credited in full toward your build, at /post-frame-buildings.